Skip to content

Work in progress

Work continues along Broadway Avenue South near Signal Point, as seen here on Sept. 6.
47248tribuneA04MLYDiggingConduit086

Work continues along Broadway Avenue South near Signal Point, as seen here on Sept. 6. The city is installing a sidewalk and storm sewer pipe. At the same time BC Hydro will do an underground feeder cable upgrade at the site.