Water flows over the Cleveland Dam as people walk with a dog in Cleveland Park in North Vancouver, B.C., on Christmas Day, Friday Dec. 25, 2015. THE CANADIAN PRESS/Darryl Dyck

‘Human error’ led to dam release on Capilano River, killing one: report

Metro Vancouver to review implementing warning system

It was human error that led to the Cleveland Dam in North Vancouver releasing a large volume of water into the Capilano River earlier this month, killing a fisherman, according to a preliminary report.

“While the review continues, we can now confirm that the clearest contributing factor was human error related to programming of the control system for the spillway gate at the Cleveland Dam,” Metro Vancouver commissioner Jerry Dobrovolny said in a statement Thursday (Oct. 8).

“Metro Vancouver takes responsibility for this mistake and our deepest sympathies go out to those affected by the tragic loss of life.”

ALSO READ: 1 dead after water suddenly gushes from dam at Capilano River in North Vancouver

On Oct. 1, emergency crews were called to an area along the river known to be a popular spot for fishing after a large volume of water poured into an area that controls the dam’s flow. Four people were rescued or able to reach shore while a man was pulled from the water in medical distress but later died of his injuries.

The man’s son is still missing.

Since the incident, questions have been raised as to why the dam – as well as the other facility operated by Metro Vancouver in Seymour – do not have public warning systems.

Dobrovolny said that is now being considered. Metro Vancouver is also bringing in expert advisors to assess current practices and procedures and provide independent advice to better its maintenance systems.

“Following technical recommendations by experts, Metro Vancouver upgraded the Cleveland Dam spillway gate from a mechanical to fully automated control system in 2002 and there have been subsequent upgrades. Metro Vancouver has not experienced a similar unintended release of water in almost two decades,” Dobrovolny said.

“We are entirely compliant with all related WorkSafeBC orders and requirements.”

Dam safety reviews happen every seven years, with the last occurring in 2016.

The spillway gate will be closed through the end of the year and possibly into the spring.


@ashwadhwani
ashley.wadhwani@bpdigital.ca

Like us on Facebook and follow us on Twitter.

Want to support local journalism? Make a donation here.

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

CH-149 Cormorant helicopters may be part of night training exercises in the Chilcotin this month. (Canadian Armed Forces photo)
442 Transport and Rescue Squadron to hold night training in the Chilcotin

The public may see flares and search and rescue technicians parachuting to the ground

Snow is in the forecast for Williams Lake Friday, Oct. 23, which has already been falling in areas of the Chilcotin as seen here at Nimpo Lake. (Harriet Hird photo)
Ice, snow, chilly temperatures in forecast for Williams Lake area

Temperatures will dip down to -11C on Friday evening

COVID-19. (Courtesy of CDC).
Interior Health reports 12 additional COVID-19 cases

The total number of cases in the region is now at 644

100 Mile Conservation officer Joel Kline gingerly holds an injured but very much alive bald eagle after extracting him from a motorist’s minivan. (Photo submitted)
Motorist pulls into B.C. RCMP detachment after roadkill eagle comes back to life in minivan

The driver believed the bird to be dead and not unconscious as it turned out to be

Actor Ryan Reynolds surprised a Shuswap family with a special birthday message to their son who was worried he’d be alone on his 9th birthday on Nov. 24. (Tiffanie Trudell/Facebook)
Ryan Reynolds text almost gives away Shuswap boy’s birthday surprise

Deadpool actor helps remind eight-year-old Canoe resident he’s not alone

Vancouver police reactivated the search for Jordan Naterer Thursday Oct. 22. Photo courtesy of VPD.
Mom of missing Manning Park hiker believes her son is waiting to come home

‘He’s going to come out of a helicopter and say ‘what took you so long?”

Is it time to start thinking about greener ways to package cannabis?

Packaging suppliers are still figuring eco-friendly and affordable packaging options that fit the mandates of Cannabis Regulations

Environment Minister George Heyman, Premier John Horgan and Energy Minister Michelle Mungall announce that B.C. Hydro is proceeding with construction of the Site C dam, Dec. 11, 2017. (Tom Fletcher/Black Press)
Site C actions, costs won’t be known until after B.C. election, Horgan says

Peace River diverted for construction of reinforced dam base

Join Black Press Media and Do Some Good

Pay it Forward program supports local businesses in their community giving

One of the squirrels who ended up having their tails amputated after getting them stuck together with tree sap. (Facebook/Wild ARC)
Squirrels recovering from tail amputation after sap situation near Victoria

BC SPCA Wild ARC says squirrels will be released back into wild, fifth sibling was euthanized

More and more electric cars are on the road, but one Chevy Bolt owner was shocked to see how much his BC Hydro bill skyrocketed once he started charging the vehicle. (Black Press file photo)
Lower Mainland man sees significant spike in BC Hydro bill after buying electrical vehicle

An increase should be expected, but Brian Chwiendacz experienced a 200-plus per cent hike

Most Read