Aerial view rendering of the eight-lane immersed tube tunnel favoured by Metro Vancouver’s board of directors to replace the aging George Massey Tunnel. (Province of British Columbia image)

B.C. VOTES 2020: We’ll build Massey bridge, B.C. Liberals say

NDP to decide on bridge or tunnel by the end of 2020

A bridge to replace the fragile, congested George Massey Tunnel under the Fraser River can be restarted soon after the Oct. 24 B.C. election, without lengthy environmental studies and a likely court challenge to the proposed twin tunnel plan, B.C. Liberal leader Andrew Wilkinson says.

Wilkinson and Richmond-Queensborough candidate Jas Johal announced at a campaign event Oct. 5 that the Massey bridge project would be part of an $8 billion infrastructure package to help B.C.’s economy recover from the COVID-19 pandemic. The cost of the bridge has risen since the NDP cancelled the project in 2017 and embarked on a study of an eight-lane tunnel option instead.

NDP leader John Horgan’s sudden election call is the latest delay for the project, halting work on a business case for a new crossing that still includes an eight to 10-lane bridge as well as the twin tunnel option favoured by Metro Vancouver municipalities.

The bridge project was halted with six kilometres of sand preload in place for the approaches and $95 million spent on assessment, design and consultation, Wilkinson said. He gave no estimate of how much the cost has risen and would only say it would be open to traffic “as soon as possible.”

“The worst possible thing you can do is to drive a great big tunnel under the river,” Wilkinson said.

NDP leader John Horgan’s sudden election call is the latest delay for the project, halting work on a business case for a new crossing that still includes an eight to 10-lane bridge as well as the twin tunnel option favoured by Metro Vancouver municipalities.

Speaking on behalf of the NDP, Delta North candidate Ravi Kahlon acknowledged that three years after cancelling the original bridge project, his government has not yet approved a design or decided between a bridge and a tunnel. That decision will come by the end of the year, he said.

RELATED: Massey crossing business study halted for snap election

RELATED: Pattullo bridge gets priority, union-only construction deal

Wilkinson said the Massey bridge would be built without tolls, mindful of the removal of tolls from the Port Mann and Golden Ears bridges that proved popular in Maple Ridge and Surrey where both parties are campaigning feverishly for the Oct. 24 election.

The B.C. Liberal government had a contract for $2.4 billion to build the Massey bridge, replacing a tunnel put in the river more than 60 years ago and now considered at risk in an earthquake. The B.C. Liberals say a new bridge will be financed out of an $8 billion “Rebuild B.C.” fund, which is in addition to existing infrastructure plans including the Langley and Vancouver rapid transit extensions now in progress.

The tunnel option could mean a delay of up to 10 years in getting a new crossing ready for use, since the Tsawwassen First Nation has opposed the plan and would likely challenge it in court due to the impact of dredging the river on Fraser River salmon, Wilkinson said. At a minimum, the tunnel option triggers a federal environmental assessment of the fish habitat impact, and if approved, the dredging and relocation of thousands of tonnes of salt-contaminated river bottom soil to create a trench for the twin tunnels.

Just before the announcement, the NDP campaign issued a statement claiming the switch would “risk major delays, risk losing federal funding and set the project back years.” Kahlon said he doesn’t know how lonh a federal fisheries review of tunnel dredging and construction would take, but the previously approved bridge would “turn Richmond into a parking lot.”


@tomfletcherbc
tfletcher@blackpress.ca

Like us on Facebook and follow us on Twitter.

BC politicsBC Votes 2020

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

CH-149 Cormorant helicopters may be part of night training exercises in the Chilcotin this month. (Canadian Armed Forces photo)
442 Transport and Rescue Squadron to hold night training in the Chilcotin

The public may see flares and search and rescue technicians parachuting to the ground

Snow is in the forecast for Williams Lake Friday, Oct. 23, which has already been falling in areas of the Chilcotin as seen here at Nimpo Lake. (Harriet Hird photo)
Ice, snow, chilly temperatures in forecast for Williams Lake area

Temperatures will dip down to -11C on Friday evening

100 Mile Conservation officer Joel Kline gingerly holds an injured but very much alive bald eagle after extracting him from a motorist’s minivan. (Photo submitted)
Motorist pulls into B.C. RCMP detachment after roadkill eagle comes back to life in minivan

The driver believed the bird to be dead and not unconscious as it turned out to be

COVID-19. (Courtesy of CDC).
Interior Health reports 12 additional COVID-19 cases

The total number of cases in the region is now at 644

Part of the committee’s business plan is to give the “school,” officially known as the Wells-Barkerville Culture and Recreation Centre, a new name. (District of Wells)
Wells school renovation gets funding boost from mining company

Barkerville Gold Mines has put half a million dollars into the project to renovate the closed school

Actor Ryan Reynolds surprised a Shuswap family with a special birthday message to their son who was worried he’d be alone on his 9th birthday on Nov. 24. (Tiffanie Trudell/Facebook)
Ryan Reynolds text almost gives away Shuswap boy’s birthday surprise

Deadpool actor helps remind eight-year-old Canoe resident he’s not alone

Vancouver police reactivated the search for Jordan Naterer Thursday Oct. 22. Photo courtesy of VPD.
Mom of missing Manning Park hiker believes her son is waiting to come home

‘He’s going to come out of a helicopter and say ‘what took you so long?”

Is it time to start thinking about greener ways to package cannabis?

Packaging suppliers are still figuring eco-friendly and affordable packaging options that fit the mandates of Cannabis Regulations

Environment Minister George Heyman, Premier John Horgan and Energy Minister Michelle Mungall announce that B.C. Hydro is proceeding with construction of the Site C dam, Dec. 11, 2017. (Tom Fletcher/Black Press)
Site C actions, costs won’t be known until after B.C. election, Horgan says

Peace River diverted for construction of reinforced dam base

Join Black Press Media and Do Some Good

Pay it Forward program supports local businesses in their community giving

One of the squirrels who ended up having their tails amputated after getting them stuck together with tree sap. (Facebook/Wild ARC)
Squirrels recovering from tail amputation after sap situation near Victoria

BC SPCA Wild ARC says squirrels will be released back into wild, fifth sibling was euthanized

More and more electric cars are on the road, but one Chevy Bolt owner was shocked to see how much his BC Hydro bill skyrocketed once he started charging the vehicle. (Black Press file photo)
Lower Mainland man sees significant spike in BC Hydro bill after buying electrical vehicle

An increase should be expected, but Brian Chwiendacz experienced a 200-plus per cent hike

Most Read