Construction is underway in Alberta on the twinning of the Trans Mountain pipeline to the B.C. coast. (Trans Mountain)

Landowner hearings begin for Trans Mountain expansion in Alberta

Detailed route talks start in Spruce Grove, in B.C. communities soon

The Canada Energy Regulator has begun its detailed route hearings on the Trans Mountain pipeline expansion project, starting with Alberta locations that are in dispute by property owners and moving to B.C. in the weeks to come.

The first two hearings were held Tuesday in Spruce Grove, with the first B.C. hearing in Kamloops in March and more to come along the expansion route through Merritt and into the Lower Mainland in the months ahead as more hearing orders are issued, a spokesperson for Canada Energy Regulator told Black Press.

“Detailed route hearings are required where an objection to the detailed route exists, and allow the commission to decide on whether the exact location of the pipeline is the best possible, and to confirm the most appropriate methods and timing of construction,” the regulator said in a statement released Tuesday.

RELATED: Industry cheers rejection of B.C.’s Trans Mountain suit

RELATED: Pipeline contractors hiring in tight skilled labour market

“Landowners whose lands are proposed to be crossed by the pipeline, as well as Indigenous groups and other persons whose land may be adversely affected were able to object to the detailed route proposed by Trans Mountain. The commission granted detailed route hearings where material changes in circumstances were identified since 2018, or where hearings had been granted but not completed prior to the court decision stopping the project in 2018.”

The twinning project runs for 1,147 km on a pipeline approximately 150 metres wide. It was re-approved by the federal government in June 2019, after additional consultation required by the Federal Court of Appeal.

Construction is underway along the Alberta portions, as well as the Edmonton and Burnaby terminals and the Westridge Marine Terminal. Trans Mountain Pipeline ULC, the company formed by the Justin Trudeau government to own and operate the 1954 pipeline and its expansion project, submitted its latest construction schedule to the regulator on Jan. 2.

From the Greater Edmonton section, the Trans Mountain right of way goes to Edson, Hinton, Spruce Grove, Stony Plain and Wabamun before reaching the Jasper-Mount Robson stretch where twinning was completed a decade ago. Entering B.C. in the North Thompson region, the pipeline route goes by Avola, Barriere, Blue River, Clearwater, Valemount and Vavenby, a region where the forest industry has been wound down due to market conditions and loss of lumber to beetle infestations and fires.

From there the Trans Mountain line goes past Kamloops and Merritt, then down the Coquihalla Pass to Hope, Chilliwack, Abbotsford, Langley, Surrey, Coquitlam and Burnaby.


@tomfletcherbc
tfletcher@blackpress.ca

Like us on Facebook and follow us on Twitter.

BC legislatureTransMountain

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

Upwards of 200 people take part in first 150 Mile Elementary Family Ice Fishing Derby

“The public support was more than we could have imagined,” she said.

WEEKEND ROUNDUP: Busy end of the week for the lakecity

The Chilcotin Road’s 9th Annual Ladies Night is this Friday along with a handful of concerts

Mother Sun performing live at arts centre Friday night

A psychedelic sound fresh from Kamloops will make its lakecity debut on Friday, Feb. 21

UPDATE: One dead after multi-vehicle collision involving logging truck on Highway 97

DriveBC says highway expected to remain closed until 8 p.m.

Sweetheart Cup Co-ed Soccer Tournament loved by all participants

Two Goals wins thriller in final over Victorious Secret

Blair says RCMP have met Wet’suwet’en conditions, calls for end to blockades

The Wet’suwet’en’s hereditary chiefs oppose the Coastal GasLink project

Petition seeks to remove local police department from Lindsay Buziak murder case

American woman starts online petition in hopes of helping Buziak family

Health officials confirm sixth COVID-19 case in B.C.

Woman remains in isolation as Fraser Health officials investigate

Study says flu vaccine protected most people during unusual influenza season

Test-negative method was pioneered by the BC Centre for Disease Control in 2004

Saskatchewan and B.C. reach championship round at Scotties

British Columbia’s Corryn Brown locked up the last berth in Pool B

B.C. lawyer, professor look to piloting a mental-health court

In November, Nova Scotia’s mental-health court program marked 10 years of existence

COLUMN: Not an expert on First Nations government structures? Then maybe you should calm down

Consider your knowledge about First Nations governance structures before getting really, really mad

Meet the Wet’suwet’en who want the Coastal GasLink pipeline

Supporters of the pipeline are upset only one side is being heard nationwide

B.C. teacher gets 15-year ban after lying about having sex with just-graduated student

Teacher had been dishonest with the B.C. Commissioner for Teacher Regulation

Most Read